John Friedman Alice Kimm Architects PS#1 Elementary School Aftercare
Logo Sm

701 E. 3rd Street, Suite 300 Los Angeles, CA 90013

T 213 253 4740

F 213 253 4760

info@jfak.net

map

PS#1 Elementary School Aftercare

Santa Monica, CA / Completed 2009


Connectivity: This 3,500 square foot building includes a new aftercare facility, kitchen, and classroom for Pluralistic School #1, an existing private elementary school in Santa Monica. Sitting between the school’s existing buildings and its athletic fields, the structure maximizes the use of its small footprint and unifies the campus with a new circulation system that loops between the classrooms and the open space.

Planning: The Aftercare room on the ground floor provides space for students who stay after normal classroom hours. Including flexibly arranged areas for homework, crafts, and cooking, its location adjacent to the basketball court, soccer field, and general play yard assures easy flow between the various interior and exterior activities. Upstairs, the new classroom (with mezzanine), looks west over the fields to catch the ocean breezes and minimize the intrusion of noise from the yards below.

Progressive Values: Throughout the project, structure is exposed so that the students can learn from the logic of construction. It also reinforces the values of openness and clarity that this progressive school promotes. Generous use of windows and skylights creates a naturally ventilated, luminous environment in which students find it easy to concentrate. The project includes no air conditioning system and uses a minimum of energy or artificial lighting.

Directed Play: The exterior of the project is clad in plaster and shiplapped cement board painted in a joyful pattern that draws from the school’s colors and reflects the sense of directed play that occurs both inside and outside its walls. It has the added attraction of hiding blemishes created by balls and other flying objects.

PS#1 Elementary School Aftercare


PS#1 Elementary School Aftercare


PS#1 Elementary School Aftercare


PS#1 Elementary School Aftercare


PS#1 Elementary School Aftercare


PS#1 Elementary School Aftercare


PS#1 Elementary School Aftercare


PS#1 Elementary School Aftercare


  • Credits
  • Principal-in-Charge: John Friedman
    Project Architect: Alice Kimm
    Project Team: Bart Chui, Valentin Lieu, Bianca Siegl
    Project Assistant: Jessie Kelly
    Structural Engineer: William Koh and Associates
    Mechanical and Plumbing Engineer: Han Engineering, Inc.
    Electrical Engineer: Pacific Engineers Group
    Civil Engineer: JMC-2
    Landscape Designer: PLACe
    Lighting Design: FIRE Ltd.

    General Contractor: Del Amo Construction

    Photography: Fotoworks
  • Client
  • PS #1 Elementary School
  • Awards
  • 2010 Westside Urban Forum, Honor Award